Skip to content
FAST & FREE SHIPPING ON ALL ORDERS IN THE LOWER 48 | US Assembled | Say NO to Chinese Manufactured Softeners
FAST & FREE SHIPPING ON ALL ORDERS IN THE LOWER 48 | US Assembled | Say NO to Chinese Manufactured Softeners

Fleck 2900 2" Progressive Flow TRIPLEX Softening System, 1,920,000 Grains Total

SKU 773-F640
by Fleck
Original price $23,999.00 - Original price $23,999.00
Original price
$23,999.00
$23,999.00
Current price $23,999.00

Fleck 2900 alternating triplex water softener, free shipping. Fleck 2900NXT 2" electronic triplex system with three 2" stainless steel meters, progressive flow.  tanks automatically come on line as dictated by flow requirements!

Affordablewater.us is your Fleck 2900NXT2 headquarters - we are the internet's leading distributor of Fleck 2900 valves and commercial water softening systems.  Short lead times on commercial valves and systems, all with free shipping!  Questions about your system design?  Give our WQA Certified Water Specialists a call today!

  • Fleck 2900NXT 2" electronic twin system with three 2" stainless steel meters allowing for ideal progressive flow setup - tanks automatically come on line as dictated by flow requirements!
  • Three meter initiated brass 2" electronic controls operate in unison for 24 hour softened water.
  • Three 36" x 72" fiberglass mineral tanks each with 20 cubic feet of high capacity cation softening resin (640,000 grains each).
  • Three brine tanks include brine safety valves.
  • The rated flow rate is 176 gpm.
  • Controls and tanks have a 5-year warranty.
  • Ships common carrier.
  • 4 week lead time

Progressive Flow is ideal for low average use flow rate/high peak flow rate situations commonly encountered in hotels and restaurants:

Unit #1 will begin In Service with #2, #3 will begin in Standby. At least one unit is In Service at all times. When flow rate to the Primary Service Unit increases to a user specified rate, the next unit in sequence will move from Standby to Service. As the flow rate falls below the user specified rate, subsequent tanks will return to Standby.

When the Primary Service Unit regenerates, the next unit in sequence will become the new Primary Service Unit. As each units capacity is reached, the controller will initiate a Regeneration of that unit. Depending on the number of units in the system and flow rate demand, the regenerated unit will then be placed either into Standby or Service. Only one unit will be in Regeneration at a time.

Fleck 2900s Service Manual

Fleck 2900s Spec Sheet

NXT2 Manual

Fast, Free Shipping

On All Orders!

Give Us a Call and Talk to a Real Expert

1 (877) 848-2532

3rd Generation Family Owned and Operated

In Business Since 1965

Custom Systems Designed Just for You

Assembled in Our Ohio Warehouse